Purpose: Boosting the energy marketing strategy.
Technical: Gain in energy production productivity due to increased storage levels Strategic: Reduction in the risk of financial losses arising from the GSF in MRE accounting Economic: Increase in the operating reserve and greater capacity for hydroelectric plants, which will provide additional revenue in capacity auctions and new ancillary services.
Development of a methodology for defining the volume of generation from the flexible portion of the SIN's hydrothermal park required for the storage level to be within the preferential range
Thymos/UFJF
R$ 3,7MM
Yes
Design
October/2022
Kickoff
February/2023
Modeling
March/2024
MVP
October/2024
Strategic plan
December/2024
Technology transfer
February/2025
P.S.:
Deadline: February/2025
Nulla aliquam ipsum mauris, non viverra est consequat eget. Aenean semper vulputate dolor, non vehicula elit convallis at. Nulla in eros sed neque tempus tempor. Fusce ac lorem dictum, consectetur lectus eget, scelerisque libero. Vestibulum non scelerisque orci. Vivamus ullamcorper magna neque, nec posuere sapien placerat in.