Purpose: Allow real-time monitoring and interventions in the cooling system (water) of four generating/transformer units at the Tucuruí HPP.
Development and validation of a pilot system for intelligent management of the cooling system of the Tucuruí HPP generating units.
Develop real-time sensing and monitoring, modernize the cooling water treatment system, microbiological/physical-chemical characterization of the water and incrustations in the pipes
SENAI- ISI TM e ISI AP
R$ 7,07MM
R$ 9,15MM
Yes
Kickoff
February/2022
Informational design
July/2022
Preliminary design
December/2022
Detailed design
April/2023
Informational design structuring
September/2023
Prototype in controlled conditions
February/2024
Eletromac assembly
May/2024
Commissioning
January/2024
Closure
February/2024
P.S.:
Deadline: February/2024