Purpose: Installation of a 1.50 MW floating PV plant in the Boa Esperança reservoir. | Expansion of the use of solar energy in hydroelectric reservoirs under different environmental and technological conditions.

Objectives

Optimize the integration of floating photovoltaics with the hydraulic source, maximizing the integrated results of electricity generation, making a comparison with the floating photovoltaic plant installed in the lake of the Sobradinho-BA hydroelectric plant.

Key Results

  • Technical: Comparison of floating photovoltaic generation in different environmental conditions
  • Strategic: Developing products and methodologies that can be used in the other Lagos Power Plants, increasing generation and reliability through hybrid generation, either at Chesf itself or at other companies in the electricity sector
  • Economic: Increased estimates of the energy security factor and, consequently, of generation demand

Main information

Scope

Optimize the integration of floating photovoltaics with the hydraulic source, maximizing the integrated results of electricity generation, making a comparison with the floating photovoltaic plant installed in the lake of the Sobradinho-BA hydroelectric plant.

Partners / Entities of support

UFC

UFPI

FASTEF

Investment (project)

R$  19.557.000,00

Scalable?

Yes

Stages

Design

November/2020

Contract

June/2022

Kickoff

August/2022

Execution

July/2023

Technology Transfer

February/2025

Closure

May/2025

Deadline for implementation (in months)

36 months

P.S.:

In progress - Floating power plant acquisition

Deadline: February/2025